PIPELAYER INSTALLATION TRAINING SERIES 
CHAPTER 2: EXCAVATIONS/TRENCHING/MANHOLES/BACKFILLING OUTLINE

A. Safety
One Call Service
Personal Protection Equip. (PPE)
Overhead Lines
Changing Conditions
Daily Requirements
Competent Person
Buried Utilities
Trench Protection
Sloping
Shoring
Shielding
Stacking Boxes
Recognize Unsafe Trenches
Establish Clear Communication
Struck by Loads/Moving Objects

B. Trenching
Undercut Control
Precise Work
Coordination with Survey
Checking Grade
Laser
Ladders
Set the Pace
Inspect Pipe
Rigging
Setting the Pipe

C. Bedding
Grade
Bedding Preparation
Proper Digouts
Preventing Movement   
Pipe Support
Types of Bedding & Haunching

 

  D. Backfilling
Initial & Final Backfill
Careful Soil Placement
Compaction
Moisture Content
Lifts
Costly Corrections
Puddling/Jetting
Safety
Plan for Drainage
Pipe Bellies

E. Manhole
Setting a Manhole
Manhole Base
Alignment Marks
Rigging & Lifting
Mudwork
Seal
Confined Spaces
Rescue

F. Dewatering
Plan for Water
Dewatering
Pump Discharge
Handling Pump
Gasoline Pump

G. Tie-Ins
Shut Offs
Investigations
Planning your Materials
Plan for Drain Water
Tapping Sleeve Procedure
Tie in Testing
Compaction  
Mark the Service Line


 

 